Loop trail study; authorization

Checkout our iOS App for a better way to browser and research.

§539l–3. Loop trail study; authorization

(a) Study

Not later than three years after funds are first made available for this purpose, the Secretary, in consultation with interested parties, shall complete a study of the suitability and feasibility of establishing, consistent with the purpose set forth in section 539l(a)(2) of this title, a loop trail for mechanized and other nonmotorized recreation connecting the trail designated as "Rogers Pass" and the trail designated as "Rollins Pass Road".

(b) Establishment

If the results of the study required by subsection (a) indicate that establishment of such a loop trail would be suitable and feasible, consistent with the purpose set forth in section 539l(a)(2) of this title, the Secretary shall establish the loop trail in a manner consistent with that purpose.

( Pub. L. 107–216, §6, Aug. 21, 2002, 116 Stat. 1060 .)


Download our app to see the most-to-date content.