Filing of notice of certified corridor route.

Checkout our iOS App for a better way to browser and research.

(1) Within 60 days after certification of an associated linear facility pursuant to this act, the applicant shall file, in accordance with s. 28.222, with the department and the clerk of the circuit court for each county through which the corridor will pass, a notice of the certified route.

(2) The notice shall consist of maps or aerial photographs in the scale of 1:24,000 which clearly show the location of the certified route and shall state that the certification of the corridor will result in the acquisition of rights-of-way within the corridor. Each clerk shall record the filing in the official record of the county for the duration of the certification or until such time as the applicant certifies to the department and the clerk that all lands required for the transmission line rights-of-way within the corridor have been acquired within such county, whichever is sooner.

History.—s. 34, ch. 2006-230; s. 78, ch. 2008-227.


Download our app to see the most-to-date content.