(1) Construction at the site shall not cause significant degradation of the water quality or injure aquatic life in St. Joseph Bay or the adjacent water of the Gulf of Mexico.
(2) Rocket launches shall be limited to small sounding rockets or other similar suborbital craft.
(3) Construction on site shall be placed within the boundaries of facilities existing on the effective date of this act.
(4) Construction of support facilities, other than those needed for direct rocket launching, shall be located a minimum of 5 miles from the launch facility. The board, or persons leasing from the board, shall not permit the use of the launch facilities if parts or services are required from any person who locates manufacturing or commercial facilities on Cape San Blas or within 5 miles of the launch facility after the passage of this act.
History.—ss. 7, 61, ch. 89-300; ss. 7, 8, ch. 90-192.