(1) If the mobile home is in the seller’s stock and not specially ordered from the manufacturer for the buyer, the maximum retention shall be $50.
(2) If the mobile home is a single-wide and specially ordered from the manufacturer for the buyer, the maximum retention shall be $350.
(3) If the mobile home is larger than a single-wide and specially ordered for the buyer from the manufacturer, the maximum retention shall be $700.
History.—s. 10, ch. 74-169; s. 2, ch. 81-318; ss. 19, 20, ch. 88-147; s. 4, ch. 91-429.