Section 5925.

Checkout our iOS App for a better way to browser and research.

The secretary shall establish a period in which to conduct the referendum that shall not be less than 10 days nor more than 60 days in duration. The secretary may prescribe additional procedures to conduct the referendum. If the initial period established is less than 60 days, the secretary may extend the period. However, the total referendum period may not exceed 60 days.

(Added by Stats. 2009, Ch. 426, Sec. 1. (AB 281) Effective October 11, 2009. Conditionally inoperative as provided in Section 5927.)


Download our app to see the most-to-date content.