Construction of distribution and drainage systems by irrigation districts or public agencies
-
Law
-
USC 43
-
Public Lands
-
RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT
-
INSTITUTION AND CONSTRUCTION OF PROJECTS
- Construction of distribution and drainage systems by irrigation districts or public agencies
§421a. Construction of distribution and drainage systems by irrigation districts or public agencies
Distribution and drainage systems authorized to be constructed under the Federal reclamation laws may, in lieu of construction by the Secretary of the Interior (referred to in sections 421a to 421h of this title as the "Secretary"), be constructed by irrigation districts or other public agencies according to plans and specifications approved by the Secretary as provided in sections 421a to 421h of this title. The drainage systems referred to in sections 421a to 421h of this title are those required for collection and removal of excess irrigation water, either on or below the surface of the ground and do not include enlargement or alteration of existing waterways for disposition or natural runoff.
(July 4, 1955, ch. 271, §1, 69 Stat. 244
;
Pub. L. 92–487, Oct. 13, 1972, 86 Stat. 804
.)
Editorial Notes
Amendments
1972-Pub. L. 92–487 substituted provisions relating to construction of distribution and drainage systems, for provisions relating to construction of irrigation systems, and inserted provisions setting forth the type of drainage systems subject to coverage of sections 421a to 421h of this title.
Download our app to see the most-to-date content.