The Secretary of the Interior (hereafter "Secretary"), acting pursuant to the Reclamation Act of 1902 (Act of June 17, 1902,
Such program shall be limited to the States and areas referred to in section 1 of the Reclamation Act of 1902 (Act of June 17, 1902,
The Secretary is authorized to enter into such agreements and promulgate such regulations as may be necessary to carry out the purposes and provisions of sections 390h to 390h–39 of this title.
The Secretary shall not investigate, promote or implement, pursuant to sections 390h to 390h–39 of this title, any project intended to reclaim and reuse agricultural wastewater generated in the service area of the San Luis Unit of the Central Valley Project, California, except those measures recommended for action by the San Joaquin Valley Drainage Program in the report entitled A Management Plan for Agricultural Subsurface Drainage and Related Problems on the Westside San Joaquin Valley (September 1990).
Non-Federal interests may submit proposals for projects eligible to be authorized pursuant to this section in the form of completed feasibility studies to the Secretary.
A project shall be considered eligible for consideration under this section if the project reclaims and reuses-
(i) municipal, industrial, domestic, or agricultural wastewater; or
(ii) impaired ground or surface waters.
Within 60 days of the enactment of this Act the Secretary shall issue guidelines for feasibility studies for water recycling and reuse projects to provide sufficient information for the formulation of the studies.
The Secretary shall review each feasibility study received under paragraph (1)(A) for the purpose of-
(A) determining whether the study, and the process under which the study was developed, each comply with Federal laws and regulations applicable to feasibility studies of water recycling and reuse projects; and
(B) the project is technically and financially feasible and provides a Federal benefit in accordance with the reclamation laws.
Not later than 180 days after the date of receipt of a feasibility study received under paragraph (1)(A), the Secretary shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives a report that describes-
(A) the results of the Secretary's review of the study under paragraph (2), including a determination of whether the project is feasible;
(B) any recommendations the Secretary may have concerning the plan or design of the project; and
(C) any conditions the Secretary may require for construction of the project.
The non-Federal project sponsor of any project determined by the Secretary to be feasible under paragraph (3)(A) shall be eligible to apply to the Secretary for funding for the Federal share of the costs of planning, designing and constructing the project pursuant to subsection (f).
The Secretary shall establish a competitive grant program under which the non-Federal project sponsor of any project determined by the Secretary to be feasible under subsection (e)(3)(A) shall be eligible to apply for funding for the planning, design, and construction of the project, subject to subsection (g)(2).
When funding projects under paragraph (1), the Secretary shall give funding priority to projects that meet one or more of the criteria listed in paragraph (3) and are located in an area that-
(A) has been identified by the United States Drought Monitor as experiencing severe, extreme, or exceptional drought at any time in the 4-year period before such funds are made available; or
(B) was designated as a disaster area by a State during the 4-year period before such funds are made available.
The project criteria referred to in paragraph (2) are the following:
(A) Projects that are likely to provide a more reliable water supply for States and local governments.
(B) Projects that are likely to increase the water management flexibility and reduce impacts on environmental resources from projects operated by Federal and State agencies.
(C) Projects that are regional in nature.
(D) Projects with multiple stakeholders.
(E) Projects that provide multiple benefits, including water supply reliability, eco-system benefits, groundwater management and enhancements, and water quality improvements.
(1) There is authorized to be appropriated to the Secretary of the Interior an additional $50,000,000 to remain available until expended.
(2) Projects can only receive funding if enacted appropriations legislation designates funding to them by name, after the Secretary recommends specific projects for funding pursuant to subsection (f) and transmits such recommendations to the appropriate committees of Congress.
(
The Reclamation Act of 1902 (Act of June 17, 1902,
Hereafter, referred to in subsec. (a), means hereafter in title XVI of
The enactment of this Act, referred to in subsec. (e)(1)(C), probably means the date of enactment of
2016-Subsecs. (e) to (g).
2000-Subsec. (b).