Inland Empire regional water recycling project

Checkout our iOS App for a better way to browser and research.

§390h–21. Inland Empire regional water recycling project

(a) In general

The Secretary, in cooperation with the Inland Empire Utilities Agency, may participate in the design, planning, and construction of the Inland Empire regional water recycling project described in the report submitted under section 390h–4(c) of this title.

(b) Cost sharing

The Federal share of the cost of the project described in subsection (a) shall not exceed 25 percent of the total cost of the project.

(c) Limitation

Funds provided by the Secretary shall not be used for operation and maintenance of the project described in subsection (a).

(d) Authorization of appropriations

There is authorized to be appropriated to carry out this section, $20,000,000.

(Pub. L. 102–575, title XVI, §16--, as added Pub. L. 110–161, div. C, title II, §210, Dec. 26, 2007, 121 Stat. 1954 .)


Editorial Notes

Codification

Section is based on section "16--" of Pub. L. 102–575. Two other sections "16--" of Pub. L. 102–575 have been enacted and are classified to sections 390h–22 and 390h–23 of this title.


Download our app to see the most-to-date content.