Orange County Regional Water Reclamation Project
-
Law
-
USC 43
-
Public Lands
-
RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT
-
GENERAL PROVISIONS
- Orange County Regional Water Reclamation Project
§390h–12j. Orange County Regional Water Reclamation Project
(a) Authorization
The Secretary, in cooperation with the appropriate State and local authorities, is authorized to participate in the design, planning, and construction of the Orange County Regional Water Reclamation Project, to reclaim and reuse water within the service area of the Orange County Water District in California.
(b) Cost share
The Federal share of the cost of a project described in subsection (a) shall not exceed 25 percent of the total cost.
(c) Limitation
The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a).
(Pub. L. 102–575, title XVI, §1624, as added
Pub. L. 104–266, §2(a)(2), Oct. 9, 1996, 110 Stat. 3292
; amended
Pub. L. 111–11, title IX, §9111(c), Mar. 30, 2009, 123 Stat. 1318
.)
Editorial Notes
Amendments
2009-Pub. L. 111–11, §9111(c)(1), struck out "Phase 1 of the" before "Orange County" in section catchline.
Subsec. (a). Pub. L. 111–11, §9111(c)(2), struck out "phase 1 of" before "the Orange County".
Download our app to see the most-to-date content.