Discontinuance of preliminary examination reports

Checkout our iOS App for a better way to browser and research.

§701b–8a. Discontinuance of preliminary examination reports

For preliminary examinations and surveys authorized in previous river and harbor and flood control Acts, the Secretary of the Army is directed to cause investigations and reports for flood control and allied purposes, to be prepared under the supervision of the Chief of Engineers in the form of survey reports, and that preliminary examination reports shall no longer be required to be prepared.

( Pub. L. 85–500, title II, §208, July 3, 1958, 72 Stat. 319 .)

References in Text

Previous river and harbor and flood-control Acts, referred to in text, means those acts prior to the River and Harbor Act of 1958 and the Flood Control Act of 1958, titles I and II of Pub. L. 85–500.


Download our app to see the most-to-date content.