37-12-307. Architectural or engineering design drawings notice.
(a) Any person preparing or designing architectural or engineering design drawings that call for excavation shall make reasonable efforts to determine at no expense to the operator the nature, location, and depth if known, of underground facilities. If the location of an operator's underground facilities within the proposed excavation area are restricted as classified by the federal or state government, a contacted operator shall disclose to the person the potential presence of the underground facilities in the proposed excavation area and any known disclosable information about the nature and location of the underground facilities, as well as the contact information, if known, of the federal or state government official who may be able to provide further information. Any person preparing or designing architectural or engineering design drawings that call for excavation shall make the information and location under this subsection a part of the plan by which the excavators operate.
(b) Any person preparing or designing architectural or engineering design drawings that call for excavation for a government entity in a public right-of-way with a project cost greater than seven hundred fifty thousand dollars ($750,000.00) may schedule one (1) or more predesign meetings. The person shall notify the notification center at least thirty (30) calendar days before the first predesign meeting and provide the person's contact information, the name of the government entity, the scheduled predesign meeting dates, the location of the proposed excavation area and the project's scope of work. The notification center shall provide this information to operators with underground facilities in the proposed excavation area. Any operator or the operator's agent receiving notice pursuant to this subsection shall do any one (1) of the following:
(i) Attend the predesign meeting and provide information on the location of the operator's underground facilities within the proposed excavation area;
(ii) Notify the person that the operator has already or will, within fourteen (14) business days of receipt of the notice, mark the location of the operator's underground facilities within the proposed excavation area in accordance with the standards set forth in W.S. 37-12-302(d);
(iii) Contact the person for conceptual drawings and then mark the location of the operator's underground facilities on the drawings. The operator shall return the marked drawings to the person within thirty (30) calendar days of receipt of the drawings.