18-5-504. Minimum standards; incorporation into other processes.
(a) No board of county commissioners shall issue a permit for a facility if that facility:
(i) Does not comply with standards properly adopted by the board of county commissioners for the construction of wind energy facilities or solar energy facilities, which standards shall not be less stringent than the standards required by this article, except as allowed by this section;
(ii) For wind energy facilities, would locate the base of any tower at a distance of less than one hundred ten percent (110%) of the maximum height of the tower from any property line contiguous or adjacent to the facility, unless waived in writing by the owner of every property which would be located closer than the minimum distance;
(iii) For wind energy facilities, would locate the base of any tower at a distance of less than one hundred ten percent (110%) of the maximum height of the tower from any public road right-of-way;
(iv) For wind energy facilities, would construct any tower or other structure, other than underground structures, transmission lines, roadways and structures appurtenant to roadways, at a distance of less than five and one-half (5.5) times the maximum height of the tower, but in no event less than one thousand (1,000) feet from any platted subdivision unless this restriction is waived in writing by the owners of all lands included within the distance specified in this paragraph;
(v) For wind energy facilities, would locate the base of any tower at a distance of less than five and one-half (5.5) times the maximum height of the tower, but in no event less than one thousand (1,000) feet from a residential dwelling or occupied structure, unless waived in writing by the person holding title to the residential dwelling or occupied structure;
(vi) For wind energy facilities, would locate the base of any tower at a distance of less than one-half (1/2) mile from the limits of any city or town;
(vii) For solar energy facilities:
(A) Would locate the facility within three hundred (300) feet of an occupied structure or residence unless waived in writing by the owner of the structure or residence;
(B) Would locate the facility within one hundred (100) feet of any outer boundary of the facility;
(C) Would locate the facility on unzoned or agricultural zoned land less than two hundred (200) feet from any public road right-of-way or on other land less than one hundred (100) feet from any public road right-of-way.
(b) No rule, regulation or law promulgated or applied by any county in this state shall adopt a standard less stringent than the minimum standards established in subsection (a) of this section. The minimum standards stated in subsection (a) of this section shall be incorporated into every existing or future county permitting or licensing process to which they are applicable so that no applicant for a permit under this article is required to submit more than one (1) application addressing these standards to any county.
(c) Notwithstanding subsection (b) of this section, any board of county commissioners for solar facilities:
(i) May vary the location and setback requirements provided in subsection (a) of this section, either on its own or by following its land use planning, zoning or conditional use processes;
(ii) For lands within the boundaries of any incorporated municipality, shall require any setbacks recommended by the governing body of the municipality within the boundaries of that municipality;
(iii) May increase setbacks required from public road rights-of-way beyond those required in this section to accommodate known big game animal migrations and frequent local wildlife movements and to reduce the risk of motor vehicle and big game animal collisions. A board of county commissioners may consult with the:
(A) Game and fish department for setbacks from public roads;
(B) Department of transportation for setbacks from state highways;
(C) County's appropriate local entity for setbacks from county roads.
(d) No board of county commissioners shall issue a permit under W.S. 18-5-502(a) until that county has adopted rules and regulations governing the notice that the application for a permit must provide to the record owners and claimants of mineral rights located on and under lands where the facility will be constructed. The rules shall conform to rules adopted by the industrial siting council for the same purpose pursuant to W.S. 35-12-105.
(e) For a permit granted for a wind energy facility under this article, there shall be no vertical construction of a wind turbine within two (2) nautical miles of any active federal military missile launch or control facility, unless the owner or developer of the wind energy facility first obtains and furnishes documentation to the board of county commissioners of:
(i) A written determination of no adverse impact on nuclear security operations from the military installation commander or the commander's designee. The determination shall not be unreasonably withheld or denied;
(ii) A determination of no hazard from the federal aviation administration; and
(iii) Documentation from the federal military aviation and installation assurance siting clearinghouse that resolves any potential adverse impact on military operations and readiness and that commits to implement required mitigation measures.