Facility operations and decommissioning—Monitoring.

Checkout our iOS App for a better way to browser and research.

The secretary or his or her representative shall monitor the operations of the mill for compliance with the conditions of the license by the owner or operator. The mill owner or operator shall be responsible for compliance, both during the lifetime of the facility and at shutdown, including but not limited to such requirements as fencing and posting the site; contouring, covering, and stabilizing the pile; and for decommissioning the facility.

[ 2012 c 117 § 428; 1979 ex.s. c 110 § 4. Formerly RCW 70.121.040.]

NOTES:

Effective date—1979 ex.s. c 110: See note following RCW 70A.310.010.


Download our app to see the most-to-date content.