Inspection—Frequency—Modification by rules.

Checkout our iOS App for a better way to browser and research.

The rules and regulations formulated by the board applying to the inspection of unfired pressure vessels may be modified by the board to reduce or extend the interval between required inspections where the contents of the vessel or the material of which it is constructed warrant special consideration.

[ 1951 c 32 § 24.]


Download our app to see the most-to-date content.