Period covered by stumpage lien.

Checkout our iOS App for a better way to browser and research.

The person granting the privilege mentioned in RCW 60.24.035 is only entitled to the lien as provided therein for saw logs, spars, piles and other timber cut during the eight months next preceding the filing of the claim, as herein provided in RCW 60.24.075.

[ 1893 c 132 § 6; RRS § 1167. Prior: Code 1881 § 1946; 1877 p 217 § 8.]


Download our app to see the most-to-date content.