Capital plan.

Checkout our iOS App for a better way to browser and research.

(1) The capital plan must adhere to the following:

(a) A current ridership demand forecast;

(b) Vehicle level of service standards as described in RCW 47.06.140;

(c) Operational strategies as described in RCW 47.60.327; and

(d) Terminal and vessel design standards as described in RCW 47.60.365.

(2) The capital plan must include the following:

(a) A current vessel preservation plan;

(b) A current systemwide vessel rebuild and replacement plan as described in RCW 47.60.377;

(c) A current vessel deployment plan; and

(d) A current terminal preservation plan that adheres to the life-cycle cost model on capital assets as described in RCW 47.60.345.

[ 2010 c 283 § 5; 2008 c 124 § 3; 2007 c 512 § 13.]

NOTES:

Findings—Intent—Effective date—2010 c 283: See notes following RCW 47.60.355.

Finding—Intent—2007 c 512: See note following RCW 47.06.140.


Download our app to see the most-to-date content.