Change in point of discharge.

Checkout our iOS App for a better way to browser and research.


  • (1) The point of discharge of water from a POTW may be changed if the Water Quality Board determines that a change is necessary:
    • (a) for treatment purposes;
    • (b) to enhance environmental quality;
    • (c) to protect public health, safety, or welfare; or
    • (d) to comply with:
      • (i) rules created by the Water Quality Board in accordance with Section 19-5-104; or
      • (ii) the POTW's discharge permit.
  • (2) Before changing the point of discharge from a POTW under Subsection (1), the Water Quality Board shall consult with the state engineer.




Download our app to see the most-to-date content.