Public workshops.

Checkout our iOS App for a better way to browser and research.


  • (1) conduct informal public workshops at locations along the proposed corridor to provide information about:
    • (a) the high voltage power line; and
    • (b) the process for obtaining a land use permit; and
  • (2) provide notice of the public workshops at least 14 days before a public workshop to:
    • (a) a newspaper of general circulation in the target study area;
    • (b) radio stations in the target study area; and
    • (c) an affected entity.




Download our app to see the most-to-date content.