Review of plans.

Checkout our iOS App for a better way to browser and research.


  • (1) The state engineer shall establish a formal written procedure for the review of plans submitted pursuant to Section 73-5a-202. Plans shall be reviewed according to:
    • (a) design criteria which the state engineer shall specify in rules; and
    • (b) data or criteria generally accepted by the general dam design community.
  • (2) Upon review of the plans, the state engineer will:
    • (a) approve them with appropriate conditions;
    • (b) reject them; or
    • (c) return them for correction.
  • (3) The state engineer shall document each review indicating:
    • (a) how the plans were reviewed; and
    • (b) his evaluation of the plans.




Download our app to see the most-to-date content.