Definitions.

Checkout our iOS App for a better way to browser and research.


  • (1) "Board" means the Board of Water Resources.
  • (2) "Committee" means the Project Management Committee created in Section 73-28-105.
  • (3)
    • (a) "Construction costs" means all costs related to the construction of the project, including the environmental mitigation costs.
    • (b) Construction costs include:
      • (i) acquisition of land and rights-of-way;
      • (ii) board and division expenses related to the project;
      • (iii) compensation for impairment of existing water rights;
      • (iv) construction of the project;
      • (v) design;
      • (vi) engineering;
      • (vii) environmental studies;
      • (viii) legal work;
      • (ix) permitting;
      • (x) planning; and
      • (xi) rebuilding and relocating highways or other facilities affected by the project.
  • (4) "Developed water" means surface water developed by the project.
  • (5) "District" means:
    • (a) the Central Iron County Water Conservancy District;
    • (b) the Kane County Water Conservancy District;
    • (c) the Washington County Water Conservancy District; or
    • (d) any combination of those districts listed in Subsections (5)(a) through (c).
  • (6) "Division" means the Division of Water Resources.
  • (7) "Environmental mitigation costs" means costs associated with obtaining permits required by federal, state, or local governmental agencies.
  • (8) "Preconstruction costs" means any of the following costs incurred before project construction begins:
    • (a) planning;
    • (b) design;
    • (c) engineering studies;
    • (d) legal work;
    • (e) permitting;
    • (f) acquisition of land and rights-of-way;
    • (g) compensation for impairment of existing water rights;
    • (h) environmental studies; or
    • (i) any combination of Subsections (8)(a) through (h).
  • (9)
    • (a) "Project" means the Lake Powell Pipeline project and associated facilities, including:
      • (i) facilities associated with environmental mitigation;
      • (ii) hydroelectric generating works and incidental electrical facilities;
      • (iii) pipelines; and
      • (iv) pumping stations.
    • (b) Notwithstanding Subsection (9)(a), associated facilities do not include the local facilities necessary for the treatment and local delivery of the developed water.
  • (10) "Project costs" include preconstruction costs, construction costs, and project operation, maintenance, repair, and replacement costs.




Download our app to see the most-to-date content.