Survey, map, and census available for public inspection.

Checkout our iOS App for a better way to browser and research.

9-3-4. Survey, map, and census available for public inspection.

Such survey, map, and census when completed and verified shall be left at some convenient place within the proposed municipality for a period of not less than thirty days for examination by those having an interest in such application.

Source: PolC 1877, ch 24, §3; CL 1887, §1024; RPolC 1903, §1419; RC 1919, §6173; SDC 1939, §45.0303; SL 2016, ch 48, §5.


Download our app to see the most-to-date content.