Restoration of drill sites and affected land.

Checkout our iOS App for a better way to browser and research.

45-6C-33. Restoration of drill sites and affected land.

The operator shall restore each drill site and other affected land as nearly as possible to its original condition including backfilling all mudpits, scattering any drill cuttings left on the surface, reseeding the drill site and approach trails, removing shot wire, or other action as may be necessary.

Source: SL 1982, ch 306, §33; SL 2011, ch 165, §213.


Download our app to see the most-to-date content.