Waste tire stockpiling and processing facilities—Promulgation of rules.

Checkout our iOS App for a better way to browser and research.

34A-6-66. Waste tire stockpiling and processing facilities—Promulgation of rules.

The department shall determine the number of stockpiling facilities that are necessary; and the board shall promulgate rules, pursuant to chapter 1-26, for waste tire stockpiling and processing facilities. The rules shall include the following:

(1)The prohibition of burning within one hundred yards of a tire stockpile;

(2)The maximum height, width, and length of a tire stockpile;

(3)Plans to control mosquitos and rodents;

(4)A facility closure plan;

(5)Specifications for fire lanes between stockpiles;

(6)Limitation of the total number of tires allowed at a single stockpile site;

(7)Criteria for the issuance of permits to qualified waste tire stockpiling and processing facilities. No waste tire stockpiling or processing may be done without a permit; and

(8)Appropriate waste tire processing methods.

Source: SL 1992, ch 254, §28; SL 2021, ch 163, § 2.


Download our app to see the most-to-date content.