34A-6-66. Waste tire stockpiling and processing facilities—Promulgation of rules.
The department shall determine the number of stockpiling facilities that are necessary; and the board shall promulgate rules, pursuant to chapter 1-26, for waste tire stockpiling and processing facilities. The rules shall include the following:
(1)The prohibition of burning within one hundred yards of a tire stockpile;
(2)The maximum height, width, and length of a tire stockpile;
(3)Plans to control mosquitos and rodents;
(4)A facility closure plan;
(5)Specifications for fire lanes between stockpiles;
(6)Limitation of the total number of tires allowed at a single stockpile site;
(7)Criteria for the issuance of permits to qualified waste tire stockpiling and processing facilities. No waste tire stockpiling or processing may be done without a permit; and
(8)Appropriate waste tire processing methods.
Source: SL 1992, ch 254, §28; SL 2021, ch 163, § 2.