Grounds for extension of time to submit information.

Checkout our iOS App for a better way to browser and research.

34-20E-4. Grounds for extension of time to submit information.

The board may grant an extension of the time in which a dispenser must report the information required by §34-20E-2 to any dispenser that is unable to submit prescription information by electronic means because of one of the following occurrences:

(1)The dispenser suffers a mechanical or electronic failure or cannot report within the required time for other reasons beyond the dispenser's control;

(2)The central repository is unable to receive electronic submissions; or

(3)Good cause shown by a dispenser.

Source: SL 2010, ch 175, §4.


Download our app to see the most-to-date content.