Collection of tolls--Duration--Credit to state highway fund.

Checkout our iOS App for a better way to browser and research.

31-10-8. Collection of tolls--Duration--Credit to state highway fund.

Any bridge purchased or constructed under §§31-10-2 to 31-10-11, inclusive, shall be free from tolls. However, tolls may be collected on the traffic crossing the bridge until such time as the net sum of tolls so collected plus funds paid as provided in §§31-10-6 and 31-10-7, equals the cost of the structure plus a reasonable rate of interest on deferred installments of the cost. The portion of the net tolls collected on the bridge, going to the State of South Dakota shall be credited to the state highway fund.

Source: SL 1947, ch 132, §5; SDC Supp 1960, §28.1429; SL 2010, ch 145, §85.


Download our app to see the most-to-date content.