The application for a base load review order under this article shall include:
(1) information showing the anticipated construction schedule for the plant;
(2) information showing the anticipated components of capital costs and the anticipated schedule for incurring them;
(3) information showing the projected effect of investment in the plant on the utility's overall revenue requirement for each year during the construction period;
(4) information identifying:
(a) the specific type of units selected for the plant;
(b) the suppliers of the major components of the plant; and
(c) the basis for selecting the type of units, major components, and suppliers;
(5) information detailing the qualification and selection of principal contractors and suppliers, other than those listed in item (4)(c) above, for construction of the plant;
(6) information showing the anticipated in-service expenses associated with the plant for the twelve months following commencement of commercial operation adjusted to normalize any atypical or abnormal expense levels anticipated during that period;
(7) information required by Section 58-33-270(B)(6);
(8) information identifying risk factors related to the construction and operation of the plant;
(9) information identifying the proposed rate design and class allocation factors to be used in formulating revised rates;
(10) information identifying the return on equity proposed by the utility pursuant to Section 58-33-220(16); and
(11) the revised rates, if any are requested, that the utility intends to put in place after issuance of the resulting base load review order.
HISTORY: 2007 Act No. 16, Section 2, eff upon approval (became law without the Governor's signature on May 3, 2007).