The board annually shall submit a report regarding major facility projects to the General Assembly that includes:
(1) the number and types of buildings designed and constructed;
(2) the level of certification of each building designed, constructed, or renovated;
(3) actual savings in energy costs;
(4) a description of all potential environmental benefits, including, but not limited to, water resources savings and the reduction of waste generation;
(5) the ability of buildings to continue to operate at the standard to which it was originally certified;
(6) the reason for any waiver granted by the State Engineer's Office; and
(7) any conflicts or barriers that hinder the effectiveness of this article.
HISTORY: 2007 Act No. 88, Section 1, eff June 20, 2007.