Nothing in Sections 42-1-400 to 42-1-450 shall be construed as preventing a workman from recovering compensation under this title from a subcontractor instead of from the principal contractor but he shall not collect from both.
HISTORY: 1962 Code Section 72-116; 1952 Code Section 72-116; 1942 Code Section 7035-22; 1936 (39) 1231.