Percolation tests and ground water determinations.

Checkout our iOS App for a better way to browser and research.

Whenever a percolation test and/or ground water determination is required on any property within this state, the registered professional engineer or registered surveyor conducting the tests shall notify the city or town engineering department where the tests are to be taken, in writing, of the date and location of the tests, at least seven (7) days prior to the taking of the tests.

History of Section.
P.L. 1926, ch. 85, § 1; G.L. 1923, § 23-19-11; P.L. 1979, ch. 39, § 1; G.L. 1956, § 23-19.2-11.


Download our app to see the most-to-date content.