Permit objections

Checkout our iOS App for a better way to browser and research.

(a) General rule.--If a well referred to in section 3211(b) (relating to well permits) will be located on a tract whose surface is owned by a person other than the well operator, the surface landowner affected shall be notified of the intent to drill and may file objections, in accordance with section 3251 (relating to conferences), based on the assertion that the well location violates section 3215 (relating to well location restrictions) or that information in the application is untrue in any material respect, within 15 days of the receipt by the surface owner of the plat under section 3211(b). Receipt of notice by the surface owner shall be presumed to have occurred 15 days from the date of the certified mailing when the well operator submits a copy of the certified mail receipt sent to the surface owner and an affidavit certifying that the address of the surface owner to which notice was sent is the same as the address listed in the assessment books in the county where the property is located. If no objection is filed or none is raised by the department within 15 days after receipt of the plat by the surface landowner or if written approval by the surface landowner is filed with the department and no objection is raised by the department within 15 days of filing, the department shall proceed to issue or deny the permit.

(b) Special circumstances.--If a well referred to in section 3211(b) will penetrate within the outside coal boundaries of an operating coal mine or a coal mine already projected and platted but not yet being operated, or within 1,000 linear feet beyond those boundaries, and, in the opinion of the coal owner or operator, the well or a pillar of coal about the well will unduly interfere with or endanger the mine, the coal owner or operator affected may file objections under section 3251 to the proposed location within 15 days of the receipt by the coal operator of the plat under section 3211(b). If possible, an alternative location at which the proposed well could be drilled to overcome the objections shall be indicated. If no objection to the proposed location is filed or if none is raised by the department within 15 days after receipt of the plat by the coal operator or owner or if written approval by the coal operator or owner of the location is filed with the department and no objection is raised by the department within 15 days of filing, the department shall proceed to issue or deny the permit.

(c) Procedure upon objection.--If an objection is filed by a coal operator or owner or made by the department, the department shall fix a time and place for a conference under section 3251 not more than ten days from the date of service of the objection to allow the parties to consider the objection and attempt to agree on a location. If they fail to agree, the department, by an appropriate order, shall determine a location on the tract of land as near to the original location as possible where, in the judgment of the department, the well can be safely drilled without unduly interfering with or endangering the mine as defined in subsection (b). The new location agreed upon by the parties or determined by the department shall be indicated on the plat on file with the department and become a permanent record upon which the department shall proceed to issue or deny the permit.

(d) Survey.--Within 120 days after commencement of drilling operations, the coal operator shall accurately locate the well by a closed survey on the same datum as the mine workings or coal boundaries are mapped, file the results of the survey with the department and forward a copy by certified mail to the well operator.

Cross References. Section 3212 is referred to in section 3218 of this title.