Lessor’s damages for default.

Checkout our iOS App for a better way to browser and research.


(2) If the measure of damages provided in subsection (1) of this section is inadequate to put a lessor in as good a position as performance would have, the measure of damages is the present value of the profit, including reasonable overhead, the lessor would have made from full performance by the lessee, together with any incidental damages allowed under ORS 72A.5300, due allowance for costs reasonably incurred and due credit for payments or proceeds of disposition. [1989 c.676 §75; 1993 c.646 §18; 2009 c.181 §43]


Download our app to see the most-to-date content.