Stream control and management projects; application; designation and implementation; rules.

Checkout our iOS App for a better way to browser and research.


(2) By utilizing existing inventories and reports, the department shall designate projects to be implemented on critically eroding stream systems of this state.

(3) The department shall utilize the resources and cooperation of other state and federal agencies to the greatest extent practicable in implementing stream bank erosion control and stream corridor management projects.

(4) In accordance with any applicable provision of ORS chapter 183, the department, by rule, shall adopt procedures to carry out the provisions of subsections (1) to (3) of this section. [1981 c.202 §§2,3; 1983 c.740 §220]


Download our app to see the most-to-date content.