Permits; requirements for project operation.

Checkout our iOS App for a better way to browser and research.


(2) The loans or grants may be conditioned to require that the recipient complete and operate the funded project as described in the loan or grant application. The department may require that before commencing the operation of a project funded with account moneys, the funding recipient demonstrate that the public benefits identified for the project, including any environmental benefits proposed at a location other than the project site, will be realized in a timely fashion.

(3) At regular intervals, and upon completion of the project, the loan or grant recipient must submit updates to the department that describe the completed work, the public benefits achieved and project expenditures. The recipient must regularly measure and report the water diverted and used from the project. The recipient must monitor, evaluate and maintain the project for the life of the loan, or for a specified number of years for a grant, and provide annual progress reports to the department. The department may impose other project-specific conditions by noting the conditions during project evaluation and including the condition in the funding agreement for the project.

(4) The department may terminate, reduce or delay funding for a project if the loan or grant recipient fails to comply with any provision of subsections (1) to (3) of this section. [2013 c.784 §14]

Note: See note under 541.651.


Download our app to see the most-to-date content.