Time limit for issuing final order or scheduling contested case hearing; extension; writ of mandamus.

Checkout our iOS App for a better way to browser and research.


(2) At the request of the applicant, the department may extend the 180-day period set forth in subsection (1) of this section for a reasonable period of time.

(3) If the applicant does not request an extension under subsection (2) of this section and the department fails to issue a proposed final order or schedule a contested case hearing on an application for a water right within 180 days after the department proceeds with the application under ORS 537.620 (5), the applicant may apply in the Circuit Court for Marion County for a writ of mandamus to compel the department to issue a final order or schedule a contested case hearing on an application for a water right. The writ of mandamus shall compel the department to issue a water right permit, unless the department shows by affidavit that to issue a permit may result in harm to an existing water right holder. [1995 c.416 §31]


Download our app to see the most-to-date content.