Technical review team.

Checkout our iOS App for a better way to browser and research.


(a) Establish methodology guidelines to be followed in the collection of baseline data;

(b) Coordinate with the applicant the use of baseline data collection methodologies as approved by the permitting and cooperating agencies; and

(c) Determine whether the mining operation as proposed in the consolidated application complies with ORS 517.956 and any other applicable requirements for a permit listed under ORS 517.971.

(2) Each permitting agency and cooperating agency shall designate an appropriate staff member to serve on the technical review team. [1991 c.735 §11; 2013 c.371 §15]


Download our app to see the most-to-date content.