(2) The department shall make a cash flow projection to determine if assumptions at the interest rate established under subsection (1) of this section are among the causes of a negative cash flow projection for the loan program. The cash flow projection required by this section shall be an estimate of the revenue received from the repayment of loans, interest earnings, administrative expenses of the loan program, payment of interest and principal on outstanding debt and other relevant factors during the period in which current outstanding bonds are required to be retired.

(3) If the cash flow projection required under subsection (2) of this section indicates that assumptions of loans at the interest rate established under subsection (1) of this section are a cause of a negative cash flow projection for the loan program, the department, by rule and notwithstanding ORS 407.325 (3), shall increase the interest rate to be paid for loans assumed under ORS 407.305 to the lowest rate per annum that assures a positive cash flow projection, but not exceeding the rate then prescribed under ORS 407.325. [1982 s.s.1 c.11 §15; 1987 c.221 §5; 1987 c.564 §1; 2005 c.625 §35; 2019 c.223 §22]


Download our app to see the most-to-date content.