Liability of contractor obtaining signatures on petition for violations committed by subcontractor; exceptions.

Checkout our iOS App for a better way to browser and research.


(a) "Contractor" means a person who contracts on predetermined terms with a chief petitioner, or a person acting on behalf of a chief petitioner, of an initiative or referendum petition or a prospective petition for a state measure to be initiated for the purpose of obtaining signatures on the petition or prospective petition.

(b) "Subcontractor" means a person who contracts on predetermined terms with a contractor for the purpose of obtaining signatures on an initiative or referendum petition or a prospective petition for a state measure to be initiated and who has no direct contractual relationship with a chief petitioner or other person acting on behalf of a chief petitioner.

(2) If a contractor has knowledge or should have had knowledge of a violation of ORS 250.048, 260.555, 260.558, 260.567, 260.575, 260.665 or 260.715 (1) or section 1b, Article IV of the Oregon Constitution, or any rule adopted by the Secretary of State related to section 1b, Article IV of the Oregon Constitution, petition sheets or circulator training, registration or certification, by a subcontractor, the violation by the subcontractor is conclusively considered a violation by the contractor.

(3) A contractor is not liable under subsection (2) of this section if the contractor notifies the Secretary of State in writing not later than one business day after the contractor obtains knowledge of a potential violation. The notice shall state:

(a) That a potential violation has occurred;

(b) The nature of the potential violation; and

(c) All specific information known to the contractor regarding the potential violation.

(4) A contractor may not be held criminally liable under this section solely based on a violation committed by a subcontractor. [2007 c.848 §7; 2009 c.533 §6; 2009 c.720 §8]