Approval of annexation or extraterritorial extension without study or hearing; conditions; appeal.

Checkout our iOS App for a better way to browser and research.


(2) If, within 25 days after the filing of an annexation petition or application for an extraterritorial water or sewer line extension, a person or governing body that received a copy of the executive officer’s analysis and recommendation under subsection (1) of this section does not ask in writing for a public hearing on the proceeding under ORS 199.461, the petition or application shall be considered approved by the commission. After such approval, the executive officer of the commission shall send written notification of the approval to the officials and persons described in ORS 199.461 (5) or (6). For an annexation petition, the notification shall contain a legal description and map describing the territory approved for annexation, and for an application under ORS 199.464 (3) or (4), a general description and map of the territory affected by the extension. If a request for a public hearing is received by the commission within the 25-day period after the filing, the commission shall proceed as provided by ORS 199.460 to 199.463 and 199.490 to 199.534.

(3) Any person, city, county or district may appeal the approval of a petition or tentative plans under this section as provided in ORS 199.461 (4). [1981 c.265 §14; 1983 c.336 §12; 1989 c.92 §20]


Download our app to see the most-to-date content.