Oklahoma State Roofing Installation Code Variance and Appeals Board.

Checkout our iOS App for a better way to browser and research.

A. 1. There is hereby created the Oklahoma State Roofing Installation Code Variance and Appeals Board. The Variance and Appeals Board shall hear testimony and shall review sufficient technical data submitted by an applicant to substantiate the proposed installation of any material, assembly or manufacturer-engineered components, equipment or system that is not specifically prescribed by an appropriate installation code, an industry consensus standard or fabricated or installed according to recognized and generally accepted good engineering practices, where no ordinance of a governmental subdivision applies. If it is determined that the evidence submitted is satisfactory proof of performance for the proposed installation, the Variance and Appeals Board shall approve such alternative, subject to the requirements of the appropriate installation code. Applications for the use of an alternative material or method of construction shall be submitted in writing to the Construction Industries Board for approval prior to use. Applications shall be accompanied by a filing fee, not to exceed Fifty Dollars ($50.00), as set by rule of the Board.

2. The Variance and Appeals Board shall also hear appeals from contractors, registered by the Construction Industries Board, and any person who has ownership interest in or is in responsible charge of the design of or work on the installation, who contest the Construction Industries Board's interpretation of the statewide code as adopted by the Oklahoma Uniform Building Code Commission, as applied to a particular installation. Such appeals shall be based on a claim that:

  • a.the true intent of the installation code has been incorrectly interpreted,
  • b.the provisions of the code do not fully apply, or
  • c.an equal or better form of installation is proposed.

Such appeals to the Variance and Appeals Board shall be made in writing to the Construction Industries Board within fourteen (14) days after a code interpretation or receipt of written notice of the alleged code violation by the licensed contractor.

B. The Variance and Appeals Board shall consist of the designated representative of the Construction Industries Board and the following members who, except for the State Fire Marshal or designee, shall be appointed by the Construction Industries Board from a list of names submitted by the professional organizations of the professions represented on the Variance and Appeals Board and who shall serve at the pleasure of the Construction Industries Board:

1. Two members shall be appointed from the Committee of Roofing Examiners; one shall be a commercial contractor with five (5) years of experience and one shall be a residential contractor with five (5) years of experience;

2. One member shall be a registered design professional who is a registered architect with at least ten (10) years of experience, five (5) years of which shall have been in responsible charge of work;

3. One member shall be a registered design professional with at least ten (10) years of structural engineering or architectural experience, five (5) years of which shall have been in responsible charge of work;

4. One member shall be a registered design professional with mechanical or plumbing engineering experience; provided, such member shall have at least ten (10) years of experience, five (5) years of which shall have been in responsible charge of work;

5. One member shall be a registered design professional with electrical engineering experience; provided, such member shall have at least ten (10) years of experience, five (5) years of which shall have been in responsible charge of work; and

6. One member shall be the State Fire Marshal or a designee of the State Fire Marshal.

C. Members, except the designee of the Construction Industries Board and the State Fire Marshal, or the designated representative of the State Fire Marshal, and employees of the Construction Industries Board, shall be reimbursed for travel expenses pursuant to the State Travel Reimbursement Act from the revolving fund created pursuant to Section 1151.20 of Title 59 of the Oklahoma Statutes.

D. The Variance and Appeals Board shall meet after the Construction Industries Board receives proper application for a variance, accompanied by the filing fee, or proper notice of an appeal, as provided in subsection A of this section.

E. The designated representative of the Construction Industries Board, shall serve as chair of the Variance and Appeals Board. A majority of the members of the Variance and Appeals Board shall constitute a quorum for the transaction of business.

Added by Laws 2014, c. 270, § 18, eff. Nov. 1, 2014.