Solid waste disposal sites - Territorial limits - Exemptions - Waivers - Filing of disposal plans - Penalties.

Checkout our iOS App for a better way to browser and research.

A. In order to protect public health and preserve the expectation of future disposal capability of areas local to a disposal site, except as otherwise provided by this section, no disposal site shall accept more than two hundred (200) tons per day of solid waste generated more than fifty (50) miles from the disposal site unless a permit application for a new disposal site is submitted and approved by the Department for such waste.

The waste generated within the fifty-mile local area shall not be considered in calculating the two-hundred-ton limit.

B. New and existing landfills, incinerators, or other sites designed, constructed and operated in accordance with the most environmentally protective solid waste regulations adopted by the Board shall be subject to neither the two-hundred-ton nor the fifty-mile limit.

C. The Department may grant a temporary waiver to the limit specified in this section in the event of an emergency. Any such waiver so granted may be conditioned on development of additional capacity in the area where the waste is generated.

D. Before any disposal site accepts for disposal any solid waste generated outside the territorial limits of this state in excess of two hundred (200) tons per day:

1. The operator of the disposal site shall submit to the Department for approval a disposal plan prepared by either the generator or shipper as set out in the rules promulgated by the Board. Such plans as a minimum shall indicate the type and amount of solid waste generated, the handling, storage, treatment, disposal method and the disposal site to be used. The disposal plans shall be kept current by the persons submitting the original disposal plans and the Department shall be advised not less than five (5) working days prior to the day on which such changes are to be implemented.

Persons storing or shipping recyclable materials in an environmentally acceptable manner for the purpose of recycling shall be required to file disposal plans required by this subsection only for those wastes which are to be disposed.

2. The disposal site shall be designed, constructed and operated in accordance with the most environmentally protective solid waste rules promulgated by the Board. For landfills, the most environmentally protective solid waste regulations shall be any of those regulations promulgated by the Board for the largest population category and which include leachate collection in the landfill design, and which were effective when the application for disposal plan approval was filed with the Department.

E. Operators of solid waste disposal sites shall reject shipments of solid waste brought into this state which do not meet all the applicable requirements of this section. All rejected solid waste shall be taken out of state by the same persons who brought it into this state in violation of the provisions of this section.

F. Fly ash and bottom ash generated by coal-fired facilities located outside the territorial limits of this state in excess of two hundred (200) tons per day shall be constructively reutilized or disposed of only in an active or inactive mining operation subject to the provisions contained in Title 45 of the Oklahoma Statutes.

G. Willful violation of this section shall constitute a felony punishable by a fine of not more than Ten Thousand Dollars ($10,000.00) or imprisonment of not more than five (5) years, or both such fine and imprisonment.

Laws 1990, c. 225, § 4, eff. Sept. 1, 1990; Laws 1990, c. 217, § 7, eff. Sept. 1, 1990; Laws 1991, c. 336, § 3, eff. July 1, 1991; Laws 1993, c. 145, § 161, eff. July 1, 1993. Renumbered from Title 63, § 1-2304 by Laws 1993, c. 145, § 359, eff. July 1, 1993.


Download our app to see the most-to-date content.