Notice to surface owner of intent to drill - Exceptions - Duty to negotiate surface damages.

Checkout our iOS App for a better way to browser and research.

Before entering upon a site for brine well drilling, except in instances where there are non-state resident surface owners, non-state resident surface tenants, unknown heirs, imperfect titles, surface owners, or surface tenants whose whereabouts cannot be ascertained with reasonable diligence, the operator shall give to the surface owner a written notice of his intent to drill containing a designation of the proposed location and the approximate date that the operator proposes to commence drilling.

Such notice shall be given in writing by certified mail to the surface owner. If the operator makes an affidavit that he has conducted a search with reasonable diligence and the whereabouts of the surface owner cannot be ascertained or such notice cannot be delivered, then constructive notice of the intent to drill may be given in the same manner as provided for the notice of proceedings to appoint appraisers set forth in Section 22 of this act.

Within five (5) days of the date of delivery or service of the notice of intent to drill, it shall be the duty of the operator and the surface owner to enter into good faith negotiations to determine the surface damages.

Added by Laws 1990, c. 255, § 20, eff. Sept. 1, 1990.


Download our app to see the most-to-date content.