| Survey and Report of County Engineer on Desired Change in Road.

Checkout our iOS App for a better way to browser and research.

Effective: October 1, 1953

Latest Legislation: House Bill 1 - 100th General Assembly

Upon the receipt of the petition provided for in section 5553.23 of the Revised Code, the board of county commissioners shall order the county engineer to make a survey of the ground over which the road is proposed to be changed and to make a report in writing, together with a plat and survey of the proposed change and his opinion as to its advantage or disadvantage. The report of such engineer shall be filed with the board prior to the hearing on such petition.


Download our app to see the most-to-date content.