| Registration and Permits From Division of Industrial Compliance.

Checkout our iOS App for a better way to browser and research.

Effective: September 10, 2012

Latest Legislation: House Bill 487 - 129th General Assembly

(A) No person shall install or make major repairs or modifications to any boiler without first registering to do so with the division of industrial compliance.

(B) No person shall make any installation or major repair or modification of any boiler without first obtaining a permit to do so from the division. The permit application form shall provide the name and address of the owner, location of the boiler, and type of repair or modification that will be made. The application permit fee shall be one hundred dollars.

(C) The superintendent of industrial compliance shall require annual registration of all contractors who install, make major repairs to, or modify any boiler. The board of building standards shall establish a reasonable fee to cover the cost of processing registrations.


Download our app to see the most-to-date content.