Variance procedures.

Checkout our iOS App for a better way to browser and research.

A. The commission shall establish by regulation a variance procedure for public water supply system and public wastewater facility operating authorities.

B. Any variance procedure established by the commission shall not allow an operating authority more than six months to obtain the service of a certified operator, except the commission may give a variance not to exceed eighteen months if the operator in charge is involved in a training course that will bring his level of competency to the level required within the eighteen-month period.

History: 1953 Comp., § 67-40-9, enacted by Laws 1973, ch. 394, § 9; recompiled as 1978 Comp., § 61-33-9; Laws 1992, ch. 44, § 9.

ANNOTATIONS

The 1992 amendment, effective March 6, 1992, twice inserted "public" in Subsection A.


Download our app to see the most-to-date content.