Installation of water meters required by certain residential buildings; exceptions. [Effective when certain conditions concerning agreement between Sierra Pacific Power Company and Pyramid Lake Paiute Tribe have been met.]

Checkout our iOS App for a better way to browser and research.

1. Every newly constructed residential building which is occupied for the first time after July 1, 1988, must be equipped with a water meter.

2. Subsection 1 does not apply to cities and towns owning and operating municipal waterworks, or to cities and towns located in a county whose population is 700,000 or more.

[Part 13:109:1919; A 1931, 320; 1955, 421] — (NRS A 1961, 101; 1967, 357; 1969, 1545; 1977, 1402; 1979, 559; 1985, 656; 1989, 1394, 1934, 1937; 2011, 1308, effective when certain conditions concerning agreement between Sierra Pacific Power Company and Pyramid Lake Paiute Tribe have been met)


Download our app to see the most-to-date content.