Stocking requirements after completion of logging operations.

Checkout our iOS App for a better way to browser and research.

1. Except as otherwise provided in subsection 2, every timber owner or operator conducting logging operations within this state shall cause the harvest area to be minimally stocked not later than 5 years after completion of the logging operations.

2. The provisions of subsection 1 do not apply:

(a) If trees are being removed to change the use of the land from forest production to another use, but the timber owner or the agent of the timber owner shall obtain a timberland conversion certificate as provided in this chapter; or

(b) To a logging operation that only involves the salvage of dead timber.

[5:355:1955] — (NRS A 1961, 165; 1971, 1449; 1973, 461; 2019, 736)


Download our app to see the most-to-date content.