Requirements for location.

Checkout our iOS App for a better way to browser and research.

The locator of a tunnel right or location shall locate his or her tunnel right or location by posting a notice of location at the face or point of commencement of the tunnel, which notice must contain:

1. The name of the locator and the locator’s mailing address.

2. The date of the location.

3. The proposed course or direction of the tunnel.

4. The height and width thereof.

5. The position and character of the boundary monuments.

6. A description of the tunnel by reference to a natural landmark or a readily identifiable artificial landmark which identifies the claim or tunnel right.

[19:89:1897; C § 226; RL § 2440; NCL § 4138] — (NRS A 1971, 2202; 1985, 1500)


Download our app to see the most-to-date content.