Procedure for selecting design-build team.

Checkout our iOS App for a better way to browser and research.

If the Department desires to contract with a design-build team pursuant to NRS 408.388 and 408.3881, the Department must select the design-build team in accordance with NRS 408.3883 to 408.3886, inclusive.

(Added to NRS by 1999, 3484; A 2001, 2022; 2003, 119)


Download our app to see the most-to-date content.