Certificate by county or city surveyor or by county or city engineer.

Checkout our iOS App for a better way to browser and research.

1. A final map presented for filing must include a certificate by the county surveyor or county engineer if a subdivision lies within an unincorporated area, and if a subdivision lies within a city, a certificate by the city surveyor, city engineer or county surveyor when for that purpose appointed by the governing body of the city, stating:

(a) That he or she has examined the final map; and

(b) That the map is technically correct and that if the monuments have not been set, that a proper performance bond has been deposited guaranteeing their setting on or before a day certain.

2. The person certifying the information required by this section must be licensed as a professional land surveyor or civil engineer pursuant to chapter 625 of NRS.

(Added to NRS by 1977, 1503; A 1989, 792; 1991, 1890; 1997, 1065)


Download our app to see the most-to-date content.