National Pollutant Discharge Elimination System permit; construction and operating permit; application; approval from Department of Natural Resources; Department of Environment and Energy; powers; applicability of Engineers and Architects Regulation Act.

Checkout our iOS App for a better way to browser and research.

54-2429. National Pollutant Discharge Elimination System permit; construction and operating permit; application; approval from Department of Natural Resources; Department of Environment and Energy; powers; applicability of Engineers and Architects Regulation Act.

(1) An applicant for a National Pollutant Discharge Elimination System permit or a construction and operating permit under the Environmental Protection Act or the Livestock Waste Management Act shall, before issuance by the Department of Environment and Energy, obtain any necessary approvals from the Department of Natural Resources under the Safety of Dams and Reservoirs Act and certify such approvals to the Department of Environment and Energy. The Department of Environment and Energy, with the concurrence of the Department of Natural Resources, may require the applicant to obtain approval from the Department of Natural Resources for any dam, holding pond, or lagoon structure which would not otherwise require approval under the Safety of Dams and Reservoirs Act but which in the event of a failure could result in a significant discharge into waters of the state and have a significant impact on the environment. The Department of Environment and Energy may provide for the payment of such costs of the Department of Natural Resources with revenue generated under section 54-2428.

(2) An applicant required to obtain a National Pollutant Discharge Elimination System permit is subject to the requirements of the Engineers and Architects Regulation Act.

(3) An applicant who has a large concentrated animal feeding operation, as defined in 40 C.F.R. 122 and 123, as such regulations existed on January 1, 2004, and who is required to obtain a construction and operating permit is subject to the requirements of the Engineers and Architects Regulation Act.

(4) An applicant who has a small or medium animal feeding operation, as defined in 40 C.F.R. 122 and 123, as such regulations existed on January 1, 2004, and who is required to obtain a construction and operating permit, but not required to obtain a National Pollutant Discharge Elimination System permit, is exempt from the Engineers and Architects Regulation Act.

(5) The department may require an engineering evaluation or assessment performed by a licensed professional engineer for a livestock waste control facility if after an inspection: (a) The department determines that the facility has (i) visible signs of structural breakage below the permanent pool, (ii) signs of discharge or proven discharge due to structural weakness, (iii) improper maintenance, or (iv) inadequate capacity; or (b) the department has reason to believe that an animal feeding operation with a livestock waste control facility has violated or threatens to violate the Environmental Protection Act, the Livestock Waste Management Act, or any rules or regulations adopted and promulgated under such acts. Animal feeding operations not required to have a permit under the Environmental Protection Act, the Livestock Waste Management Act, or the rules and regulations adopted and promulgated pursuant to such acts are exempt from the Engineers and Architects Regulation Act.

Source

  • Laws 1998, LB 1209, § 12;
  • Laws 1999, LB 870, § 13;
  • Laws 2000, LB 900, § 243;
  • Laws 2003, LB 619, § 16;
  • R.S.Supp.,2003, § 54-2412;
  • Laws 2004, LB 916, § 18;
  • Laws 2005, LB 335, § 80;
  • Laws 2006, LB 975, § 11;
  • Laws 2007, LB313, § 1;
  • Laws 2019, LB302, § 59.

Cross References

  • Engineers and Architects Regulation Act, see section 81-3401.
  • Environmental Protection Act, see section 81-1532.
  • Safety of Dams and Reservoirs Act, see section 46-1601.


Download our app to see the most-to-date content.